top of page

News

SR 167 OPENING SOONSR 167 Corridor Improvements Project

Sep 3
1 min read

SR 167 OPENING SOON


SR 167 Corridor Improvements Project


Project overview


The SR 167 Corridor Improvements Project is comprised of the SR 167 Toll Equipment Upgrade Project and the SR 167, SR 516 to South 277th Street Southbound Auxiliary Lane Project. As part of the SR 167 Toll Equipment Upgrade Project, we plan to update the SR 167 toll system to create consistency along the I-405/SR 167 corridor. This project would upgrade the SR 167 toll equipment to be the same as the I-405 toll equipment, resulting in a continuous 50-mile I-405/SR 167 express toll lane system and a consistent customer experience in the express toll lanes. We also plan to construct an auxiliary lane on southbound SR 167 between SR 516 and South 277th Street in Kent.


Once the project is complete, travelers will experience new, modern SR 167 express toll lanes that tie into the Renton to Bellevue I-405 express toll lane system, currently under construction, and the express toll lanes to Lynnwood, which opened to the public in 2015. The long-term vision includes a 50-mile express toll lane system between SR 512 in Puyallup and the I-405/I-5 interchange in Lynnwood.

 
 
 

1 Comment


Abbey Lee
Sep 07

Been trying out Nano Banana for AI image generation lately. You just describe what you want in plain text and it generates something — built on Gemini so the quality is decent. Handles a range of styles from realistic to anime. Useful for quick concept visuals without needing to set up anything locally.

Like

Sports

Entertainment

bottom of page